Alpengeist
This ride is themed as a runaway ski lift. Check out the poor guy on the right!
Alpengeist opened on March 22, 1997. It was built by Bolliger & Mabillard. It has six inversions: Immelmann inversion, 106-foot tall vertical loop, cobra roll, zero gravity roll, and corkscrew. The track is 3,828 feet long.